PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Welding extension beams at Derrick -3 (2nd Floor) Facing East (800x600).jpg Welding the metal decking at Derrick -3 (3rd Floor) from Column line H-M to 4-6 Facing North (800x600).jpg Extension beams at Derrick -3 (2nd Floor) Facing East (800x600).jpg Extension beams at Derrick -3 (2nd Floor) Facing North-West (800x600).jpg Started building rebar mats for Stair -4 (3rd Floor) Facing North (800x600).jpg Started stripping the shear wall panels at Elev. 4-Stair -2 (3rd Floor) Facing South-West (800x600).jpg